
Add to Cart
With a contemporary look, people could watch movies in style and comfort with the luxury home cinema chair in black.Upholstered in quality imported leather, this chair is perfect for creating your very own home theatre or for pride of place in your living room.This inclining cinema seat also features a reclining and lumber system for the ultimate in relaxation. Padded backrest, large-size seat cushion and curve-shaped armrests, are all designed to offer optimal comfort on the sensory of feeling. Featuring with a push-back mechanism, this single. Sofa can be easily adjust into several positions, customized to meet your different needs.
Product Name | Cinema sofa recliner | Style | Luxury |
Brand | USIT | Color | As option |
Function | Electric Recliner Chair | Place of Product | Guangdong ,China |
Fabric | Half leather, PU, fabric, etc | Modes of packing | Standard Packing |
Size | As option | After sale service | 5 years warranty |
USIT SEATING keeps on designing and producing electric recliner lounge sofa with different functions for leting movie-goers have a good sitting experience and let the theater space-save and easily maintence.
Cover | Premium genuine leather,half leather (genuine leather matched PU ), PU, fabric |
Foam | High-density foam with strong restoring function; |
Structure | High-strength metal frame |
Functions | Manual,electrical mechanism for back,headrest,legrest |
Accessories | Lighting cup,gravity sensor ,heat seat cushion etc |
Option | CA117,BS5852 fireproof for foam and cover. |
Standard | High-strength steel structure. |
1 | 2 | 3 | 4 | 5 | 6 |
Embroidery logo or number | Aisle light | Reading Light | Table for dining in call service system is option | Lift up seat for easily maintenance and cleaning,seat cover can be changed eaisly | 1 Hall sears reclining controlled by a remote |
7 | 8 | 9 | 10 | 11 | 12 |
Sharing 1 plug by 1 low | USB charge | Call service | Chilling cupholder | Underlight&Warming seat | Electric headrest |
Q : Are you trading company or manufacturer ?
A : We are factory. Factory located in Sanshui, Foshan, with showroom.
Q : How long is your delivery time?
A : It takes 25-45 days after recieved the deposit.
Q : What is your terms of payment ?
A : option 1: T.T 30% of total amount as deposit before production, 70% of total amount as balance before shipping. option 2: L/C at sight or 60-180 days upon to the fund data.
Q : Do you offer Trade Assurance?
A : Yes, we provide Trade Assurance.